Instock · 53.8 - level 1 perimeter straight bracing connector
Connectors
53.8 53.9 53.10 53.11 53.12 53.13 53.18 53.19 53.20 53.21 53.22 53.23 53.24 53.25 53.26 53.27 53.28 53.29
53.8 - level 1 perimeter straight bracing connector
Overview
Assembled view
Assembled 53.8
Exploded view
Exploded-view of 53.8
Parts
See order of use for 53.8 - level 1 perimeter straight bracing connector
Assembly steps
These are assembly instructions for adding fasteners to a connector adaptation. Before adding fasteners the following are prerequisites:
- the slab is level
- baseplate connector is staged per layout
- sandwich panels are staged
Initial position state of 53.8
Step 1
Position 2 pcs. of 4.11 shim for baseplate connector in such a way that they ensure uniform levelness across all connectors on the first level.
Step 2
Drill holes at the designated points, then proceed to securely install 4 pcs. of 99.15 anchor 3/8-16 in these holes.
Step 3
Insert 2 pcs. of 1.5 plywood washer into sandwich panel holes.
Step 4
Position 3.4 spacer as depicted on the picture above.
Step 5
Position 2 pcs. of 10.15 floor plate with countersunk holes as depicted in the picture above.
Step 6
Fasten floor plates with 8 pcs. of 99.73 countersunk screw countersunk screw in designated holes for countersunk screws.
Step 7
Position 15.40 bracing bracket as depicted on the image.
Step 8
Add 4 pcs. of 99.91001 washer onto the screws and fasten with 4 pcs. of 99.13 hex nut.