Instock · 53.23 - multi-level internal standalone connector

53.23 - multi-level internal standalone connector

Overview

See 3D overview of 53.23

Assembled view

Assembled 53.23

Exploded view

Exploded-view of 53.23

Parts

See order of use for 53.23 - multi-level internal standalone connector

Assembly steps

Prerequisites

  1. fL2 or higher is installed
  2. central connector is installed
  3. sandwich panels are installed

Initial position state of 53.23

Step 1

Place 3 pcs. 99.91001 washer and fix with 3 pcs. 99.91035 screw.

Step 2

Position 2 pcs. of 10.15 floor plate with countersunk holes as depicted in the picture above.

Step 3

Fasten floor plates with 6 pcs. of 99.73 countersunk screw in designated holes for countersunk screws.